Second interconnector ‘hits other milestones as works are progressing at a fast pace’
Malta's plans to strengthen its energy security and grid resilience have reached another important milestone, a statement by Interconnect Malta read. "With the signing of the 'Tender for the Supply and Installation of a 132kV Variable Shunt Reactor at Magħtab Terminal Station, with PowerFix JV, all the Engineering, Procurement and Construction (EPC)